Close Menu
  • AI
  • Content Creation
  • Tech
  • Robotics
AI-trends.todayAI-trends.today
  • AI
  • Content Creation
  • Tech
  • Robotics
Trending
  • OpenRouter Cuts Three Suppliers After AI Immediate Publicity Findings – Unite.AI
  • A Group of Researchers from Columbia and CertiK Introduce TensorLean for Formal Verification of GPU Kernels
  • Collectively AI Discloses Immediate Leak After Coding Agent Uncovered Credential – Unite.AI
  • Dragos Finds Immediate Leaks and Stolen Keys in AI Provide Chains
  • Lean and Mathlib Communities Certify Claude-Assisted Riemann Proof – Unite.AI
  • AWS Routes HyperPod Inference Throughout Areas From One Endpoint – Unite.AI
  • DailyAI Briefing: A Lean-checked Riemann proof, plus 4 extra
  • Anthropic Shares Drop 8.5% in Second Session Throughout AI Selloff – Unite.AI
AI-trends.todayAI-trends.today
Home»AI»Power Play: The Great Big Power Play

Power Play: The Great Big Power Play

AI By Gavin Wallace30/12/20253 Mins Read
Facebook Twitter LinkedIn Email
China Unveils World’s First AI Hospital: 14 Virtual Doctors Ready
China Unveils World’s First AI Hospital: 14 Virtual Doctors Ready
Share
Facebook Twitter LinkedIn Email

Back yourself 2017 Get Out The following are some examples of how to get started: The Shape of Water The movie is playing now. Zohran Mamdani Young Cardamom is still known by his stage name. Trump Newly elected, the administration wanted to promote its favorite energy sources.

The administration provided subsidies in that same year to struggling coal and nuclear plants. They were being under pressure due to the rising price of gas and low-cost renewable energy. Taxpayers would have been on the hook to pay billions. The plan failed.

In the following years, nuclear power continued to hit roadblocks. Since 2020, three nuclear power plants have closed. Construction of two of only four reactors that were started in 2000 has been put on hold. political scandal. The coal industry continued to decline. comprises just 17 percent of the US power mixThe rate has dropped from the high of 45% in 2010.

Both of these sources of energy are now getting a second chance. This time, the buzz is different. AIIt’s not clear that there will be a significant difference in the end result.

In 2025, Trump’s administration will not only promote nuclear power, it will also position this technology as the solution for AI energy requirements. President Trump signed executive orders to increase nuclear power in the US. This included an order to build 10 new large reactors before 2030. A pilot program at the Department of Energy created as a result of May’s executive orders—coupled with a serious reshuffling of the country’s nuclear regulator—has already led to breakthroughs from smaller startups. Chris Wright, Energy Secretary said AI progresses in September “will be accelerated by rapidly unlocking and deploying commercial nuclear power.”

Tech companies are also investing in the administration’s initiative. Google, Amazon, Microsoft, and other tech giants have signed a number of deals with nuclear power companies in the last few years to provide energy for data centers. Microsoft has even joined World Nuclear Association Multiple retired reactors in the US are being considered for restarts—including two of the three that have closed in the past five years—with the tech industry supporting some of these arrangements. Microsoft’s high-profile restart at the Three Mile Island nuclear power plant is included in this category. being backed A $1 billion federal loan. Both the public and private sectors should push for nuclear power: public support for nuclear power It’s the highest since 2010.

Even though all the This, nuclear’s practicalities leave its future in question. The majority of the cost is not due to onerous regulation but rather from construction. Critics can be wary of juiced-up valuations For small modular reactor companies in particular those who have strong connections to Trump’s administration. The $80 billion government deal with Westinghouse, a reactor giant, in October was light on detail and left more questions for the industry than answers. The timeline remains a challenge despite the high-profile deals which promise reactors will be up and running within a few short years.

artificial intelligence data centers energy expired/tired/wired nuclear power power grid
Share. Facebook Twitter LinkedIn Email
Avatar
Gavin Wallace

Related Posts

Dragos Finds Immediate Leaks and Stolen Keys in AI Provide Chains

22/11/2026

DailyAI Briefing: A Lean-checked Riemann proof, plus 4 extra

21/11/2026

Common Tech Bros Are Fearful About Honeypots

21/11/2026

Cops Are Pushing Extraordinarily Corny ‘Grand Theft Auto 6’ Slop

21/11/2026
Top News

Greg Brockman Defends $30B OpenAI Stake: ‘Blood, Sweat, and Tears’

Arm Now Makes Its own Chips

Google is not banning ads in Gemini

AI Videos of Black Women Depicted as ‘Bigfoot’ Are Going Viral

Nano Banana 2 – the latest version of Google AI Image Generator

Load More
AI-Trends.Today

Your daily source of AI news and trends. Stay up to date with everything AI and automation!

X (Twitter) Instagram
Top Insights

AI Brokers Are About to Flood the Workforce. No One’s Prepared for It

28/09/2026

US Tech Giants race to spend Billions in UK Artificial Intelligence Push

17/09/2025
Latest News

OpenRouter Cuts Three Suppliers After AI Immediate Publicity Findings – Unite.AI

22/11/2026

A Group of Researchers from Columbia and CertiK Introduce TensorLean for Formal Verification of GPU Kernels

22/11/2026
X (Twitter) Instagram
  • Privacy Policy
  • Contact Us
  • Terms and Conditions
© 2026 AI-Trends.Today

Type above and press Enter to search. Press Esc to cancel.